Supply Date31 Oct 2019
Contract NumberOS/MN ORE/51/2019
ItemManganese Ore
Supplier NameSolomon Tembo ( Shedrick )
Grade (%)Low (32% - 38%)
Lot NumberSolomon Tembo ( Shedrick ) Mn ore - LG
Deviance0
Inward Quantity39.29
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1894.5
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn32.5
Fe10.6
SiO210.1
Al2O35.9
P0.16
Size 0-10MM10-100mm
Size 10-20MM
Size 20-100MM
Size +100MM