Supply Date28 Jun 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity31.48
Freight25.19
Loading Charges726.9047954
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3476.97
Conversion Rate (Please insert 1 if no conversion is required)17.004
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.58
Fe6.95
SiO209.63
Al2O35.30
P0.128
Size 0-10MM100
Size 10-20MM0
Size 20-100MM0
Size +100MM0
MOISTURE1.95