Supply Date27 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity34.2
Freight482.57352
Loading Charges0
Offloading Charges428.3765018
Royalty169.1898
Other Cost17.004
Quality Deviance0
Grade Deviance0
Total Cost5827
Conversion Rate (Please insert 1 if no conversion is required)17.004
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.90
Fe3.75
SiO210.75
Al2O34.85
P0.134
Size 0-10MM2.45
Size 10-20MM1.54
Size 20-100MM86.31
Size +100MM9.70
MOISTURE1.35