Supply Date16 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity40.72
Freight400
Loading Charges87.14333988
Offloading Charges-8.6857
Royalty113.586
Other Cost17.004
Quality Deviance0
Grade Deviance0
Total Cost5769.02
Conversion Rate (Please insert 1 if no conversion is required)17.004
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.37
Fe6.10
SiO214.20
Al2O35.25
P0.120
Size 0-10MM5.10
Size 10-20MM3.25
Size 20-100MM76.87
Size +100MM14.78
MOISTURE1.38