Supply Date13 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity43.32
Freight400
Loading Charges410.52
Offloading Charges2.415110803
Royalty142.49
Other Cost17.004
Quality Deviance0
Grade Deviance0
Total Cost7063.14
Conversion Rate (Please insert 1 if no conversion is required)17.004
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.23
Fe4.12
SiO211.85
Al2O34.49
P0.116
Size 0-10MM4.24
Size 10-20MM4.68
Size 20-100MM72.57
Size +100MM18.51
MOISTURE2.14