Supply Date12 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity31.62
Freight29.4048
Loading Charges10
Offloading Charges3.385199241
Royalty6.91
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4923.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.08
Fe6.75
SiO214.05
Al2O35.88
P0.140
Size 0-10MM4.95
Size 10-20MM2.10
Size 20-100MM92.95
Size +100MM0
MOISTURE2.05