Supply Date04 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity36.16
Freight29.4048
Loading Charges10
Offloading Charges2.395188053
Royalty7.33
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5609.5
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.33
Fe4.55
SiO213.10
Al2O35.16
P0.132
Size 0-10MM3.85
Size 10-20MM2.05
Size 20-100MM83.02
Size +100MM11.08
MOISTURE2.05