Supply Date01 Jun 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity34.66
Freight29.405
Loading Charges10
Offloading Charges2.395268321
Royalty7.45
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5380.97
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.64
Fe6.54
SiO211.98
Al2O34.52
P0.129
Size 0-10MM6.59
Size 10-20MM4.28
Size 20-100MM79.24
Size +100MM9.89
MOISTURE1.35