Supply Date26 May 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity40.86
Freight400
Loading Charges443.72889
Offloading Charges6.52692
Royalty124.61
Other Cost17.259
Quality Deviance0
Grade Deviance0
Total Cost6610.25
Conversion Rate (Please insert 1 if no conversion is required)17.259
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.31
Fe3.95
SiO211.80
Al2O35.22
P0.114
Size 0-10MM2.68
Size 10-20MM3.70
Size 20-100MM62.72
Size +100MM30.90
MOISTURE0.95