Raw Material Inward
| Supply Date | 19 May 2022 |
|---|---|
| Contract Number | SAFAL/P/STEAM COAL/05.04/2022 |
| Item | Steam Coal |
| Supplier Name | Maamba Energy Limited |
| Grade (%) | N/A |
| Lot Number | Coal( Maamba Colleries)-size-10-50mm(Nut's) |
| Deviance | 0 |
| Inward Quantity | 33.96 |
| Freight | 52.73 |
| Loading Charges | 0 |
| Offloading Charges | 7.2795 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4961.88 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |