Raw Material Inward
| Supply Date | 12 May 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/05.94/2022 |
| Item | Manganese Ore |
| Supplier Name | KEMOSE MINING LTD |
| Grade (%) | High (44% - 50%) |
| Lot Number | kemose mining-MN ORE |
| Deviance | 0 |
| Inward Quantity | 25.2 |
| Freight | 350 |
| Loading Charges | -400 |
| Offloading Charges | 0 |
| Royalty | 83.18838 |
| Other Cost | 17.259 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 2409.83 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.259 |
| Inward Status | Rejected |