Supply Date04 May 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity35.18
Freight400
Loading Charges0
Offloading Charges437.29
Royalty136.17
Other Cost17.259
Quality Deviance0
Grade Deviance0
Total Cost5688.48
Conversion Rate (Please insert 1 if no conversion is required)17.259
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.38
Fe3.95
SiO29.24
Al2O35.79
P0.112
Size 0-10MM5.37
Size 10-20MM2.72
Size 20-100MM59.22
Size +100MM32.58
MOISTURE2.02