Supply Date14 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity39.36
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.49
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5273.45
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.15
Fe3.05
SiO29.82
Al2O33.21
P0.12
Size 0-10MM4.55
Size 10-20MM1.96
Size 20-100MM64.59
Size +100MM28.9
MOISTURE0.78