Supply Date12 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.44
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.49
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4748.25
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.59
Fe3.12
SiO29.96
Al2O33.92
P0.115
Size 0-10MM3.76
Size 10-20MM2.09
Size 20-100MM61.35
Size +100MM32.8
MOISTURE0.76