Supply Date12 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.32
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.49
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4866.15
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.37
Fe3.55
SiO29.2
Al2O34.1
P0.11
Size 0-10MM2.41
Size 10-20MM1.56
Size 20-100MM64.77
Size +100MM31.26
MOISTURE0.69