Supply Date12 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.06
Freight20.49
Loading Charges0
Offloading Charges0
Royalty7.49
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4831.32
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.94
Fe3.28
SiO29.77
Al2O33.72
P0.12
Size 0-10MM3.27
Size 10-20MM1.94
Size 20-100MM68.89
Size +100MM24.9
MOISTURE0.71