Raw Material Inward
| Supply Date | 23 Apr 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/01.09/2022 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Ltd- Mn Ore |
| Deviance | 0 |
| Inward Quantity | 37.64 |
| Freight | 400 |
| Loading Charges | 504.12 |
| Offloading Charges | 0 |
| Royalty | 154.38 |
| Other Cost | 45.044 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 6166.18 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.724 |
| Inward Status | Accepted |