Supply Date22 Apr 2022
Contract NumberSAFAL/P/MN ORE/04.93/2022
ItemManganese Ore
Supplier NameDominic M Katongo
Grade (%)High (44% - 50%)
Lot NumberDominic Katongo- Mn Ore HG
Deviance0
Inward Quantity39
Freight370
Loading Charges17.724
Offloading Charges0
Royalty0
Other Cost-74.24083692
Quality Deviance0
Grade Deviance0
Total Cost4388.67
Conversion Rate (Please insert 1 if no conversion is required)17.724
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.45
Fe3.52
SiO212.84
Al2O35.10
P0.256
Size 0-10MM7.90
Size 10-20MM3.85
Size 20-100MM51.49
Size +100MM37.11
MOISTURE2.08