Supply Date22 Apr 2022
Contract NumberSAFAL/P/MN ORE/04.93/2022
ItemManganese Ore
Supplier NameDominic M Katongo
Grade (%)High (44% - 50%)
Lot NumberDominic Katongo- Mn Ore HG
Deviance0
Inward Quantity40.02
Freight370
Loading Charges17.724
Offloading Charges0
Royalty115.73772
Other Cost-192.1074333
Quality Deviance0
Grade Deviance0
Total Cost4498.65
Conversion Rate (Please insert 1 if no conversion is required)17.724
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.06
Fe3.10
SiO212.75
Al2O34.84
P0.264
Size 0-10MM8.02
Size 10-20MM4.10
Size 20-100MM53.60
Size +100MM34.28
MOISTURE1.87