Supply Date26 Feb 2022
Contract NumberSAFAL/P/MN ORE/01.10/2022
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity29.12
Freight31.23567
Loading Charges1
Offloading Charges0
Royalty6.86
Other Cost13.09855769
Quality Deviance0
Grade Deviance0
Total Cost3558.3
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.90
Fe7.10
SiO212.50
Al2O33.99
P0.12
Size 0-10MM1.6
Size 10-20MM2.15
Size 20-100MM27.15
Size +100MM69.10
MOISTURE1.10