Supply Date25 Feb 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity41.58
Freight345
Loading Charges17.448
Offloading Charges0
Royalty102.9432
Other Cost-440.3291
Quality Deviance0
Grade Deviance0
Total Cost4349.27
Conversion Rate (Please insert 1 if no conversion is required)17.448
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.50
Fe1.79
SiO215.90
Al2O34.10
P0.12
Size 0-10MM7.10
Size 10-20MM4.95
Size 20-100MM36.66
Size +100MM51.29
MOISTURE2.60