Supply Date24 Feb 2022
Contract NumberSAFAL/P/MN ORE/01.10/2022
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity29.46
Freight31.23567
Loading Charges1
Offloading Charges0
Royalty7.19
Other Cost13.03496266
Quality Deviance0
Grade Deviance0
Total Cost3607.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.01
Fe3.90
SiO28.90
Al2O32.83
P0.131
Size 0-10MM1.10
Size 10-20MM1.20
Size 20-100MM27.60
Size +100MM70.10
MOISTURE0.95