Supply Date10 Feb 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity25.9
Freight21.77
Loading Charges0
Offloading Charges0
Royalty5.46
Other Cost-1.147058824
Quality Deviance0
Grade Deviance0
Total Cost3395.05
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.85
Fe5.90
SiO216.88
Al2O35.71
P0.140
Size 0-10MM15.80
Size 10-20MM4.06
Size 20-100MM30.94
Size +100MM49.20
MOISTURE7.4