Raw Material Inward
| Supply Date | 14 Feb 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/01.09/2022 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Ltd- Mn Ore |
| Deviance | 0 |
| Inward Quantity | 36.82 |
| Freight | 345 |
| Loading Charges | 17.448 |
| Offloading Charges | 0 |
| Royalty | 116.7271 |
| Other Cost | 5.86654 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4822.06 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.448 |
| Inward Status | Accepted |