Raw Material Inward
| Supply Date | 31 Jan 2022 |
|---|---|
| Contract Number | SAFAL/P/STEAM COAL/01.02/2022 |
| Item | Steam Coal |
| Supplier Name | Maamba Energy Limited |
| Grade (%) | N/A |
| Lot Number | Coal( Maamba Colleries)-size-10-50mm(Nut's) |
| Deviance | 0 |
| Inward Quantity | 29.48 |
| Freight | 880 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 75.28913365 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4180.83 |
| Conversion Rate (Please insert 1 if no conversion is required) | 16.518 |
| Inward Status | Accepted |