Supply Date28 Jan 2022
Contract NumberSAFAL/P/IRON ORE/12.15/2021
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberAlex Siulemba- Iron Ore
Deviance0
Inward Quantity31.68
Freight345
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1265.82
Conversion Rate (Please insert 1 if no conversion is required)16.518
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe65.71
Mn0.28
SiO24.85
Al2O32.41
P0.124
Size 0-10MM10-100mm