Supply Date17 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.42
Freight24.22
Loading Charges0
Offloading Charges0
Royalty7.82
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5027.42
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.15
Fe3.92
SiO210.08
Al2O33.75
P0.107
Size 0-10MM5.22
Size 10-20MM2.05
Size 20-100MM52.67
Size +100MM40.06
MOISTURE2.90