Supply Date17 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity38.18
Freight25.43
Loading Charges0
Offloading Charges0
Royalty7.36
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5299
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.71
Fe3.75
SiO29.87
Al2O34.12
P0.114
Size 0-10MM7.40
Size 10-20MM3.10
Size 20-100MM50.40
Size +100MM39.10
MOISTURE3.08