Supply Date25 Jan 2022
Contract NumberSAFAL/P/MN ORE/01.04/2022
ItemManganese Ore
Supplier NameGAEA MANAGEMENT SERVICES LTD
Grade (%)High (44% - 50%)
Lot NumberGAEA MANAGEMENT - MANGANESE ORE
Deviance0
Inward Quantity20.64
Freight0
Loading Charges0
Offloading Charges0
Royalty1.44
Other Cost-28.18
Quality Deviance0
Grade Deviance0
Total Cost1512.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.06
Fe4.65
SiO223.10
Al2O35.29
P0.124
Size 0-10MM19.24
Size 10-20MM06.15
Size 20-100MM66.77
Size +100MM7.84
MOISTURE4.12