Supply Date22 Jan 2022
Contract NumberSAFAL/P/MN ORE/01.07/2022
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.88
Freight24.2
Loading Charges1
Offloading Charges0
Royalty7.31
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4796.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.54
Fe2.55
SiO213.86
Al2O34.90
P0.111
Size 0-10MM7.95
Size 10-20MM3.18
Size 20-100MM54.61
Size +100MM34.26
MOISTURE3.82