Maintenance Reminder
| Type | Scheduled Maintenance |
|---|---|
| Details | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. |
| Furnace | Other |
| Equipment | CHIPPING YARD CRANE NO. 2 |
| Reminder Date | 30 Apr 2020 |
| Nature Of Maintenance | Electrical |
| Remark | (not set) |
| Frequency (in days) | 7 |
| Next Notification | 04 Jun 2026 |
| Reminder Status | Started |