Supply Date20 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.26
Freight25.426
Loading Charges1
Offloading Charges0
Royalty7.01
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5158.13
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.57
Fe2.68
SiO214.14
Al2O33.85
P0.108
Size 0-10MM6.59
Size 10-20MM4.70
Size 20-100MM54.46
Size +100MM34.25
MOISTURE4.20