Supply Date19 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.86
Freight22.1
Loading Charges0
Offloading Charges0
Royalty6.98
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4438.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.48
Fe2.95
SiO214.12
Al2O33.84
P0.112
Size 0-10MM9.16
Size 10-20MM3.74
Size 20-100MM47.02
Size +100MM40.08
MOISTURE4.05