Supply Date18 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.04
Freight24.216
Loading Charges1
Offloading Charges0
Royalty7.61
Other Cost-0.645116537
Quality Deviance0
Grade Deviance0
Total Cost4944
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.50
Fe2.10
SiO214.20
Al2O34.03
P0.11
Size 0-10MM5.91
Size 10-20MM3.75
Size 20-100MM45.10
Size +100MM45.28
MOISTURE3.12