Supply Date17 Jan 2022
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.78
Freight25.4268
Loading Charges1
Offloading Charges0
Royalty8.19
Other Cost4.980942298
Quality Deviance0
Grade Deviance0
Total Cost5274
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.25
Fe4.10
SiO28.90
Al2O34.03
P0.098
Size 0-10MM5.10
Size 10-20MM3.26
Size 20-100MM53.80
Size +100MM37.84
MOISTURE2.45