Supply Date11 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.1
Freight24.216
Loading Charges1
Offloading Charges0
Royalty7.76
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5118.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.44
Fe4.24
SiO211.70
Al2O34.38
P0.112
Size 0-10MM6.75
Size 10-20MM1.82
Size 20-100MM41.21
Size +100MM50.22
MOISTURE2.70