Supply Date14 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.18
Freight24.216
Loading Charges1
Offloading Charges0
Royalty6.32
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4666.8
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.75
Fe3.48
SiO215.70
Al2O34.90
P0.121
Size 0-10MM14.95
Size 10-20MM2.70
Size 20-100MM44.30
Size +100MM38.05
MOISTURE5.84