Supply Date14 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.18
Freight24.4268071
Loading Charges1
Offloading Charges0
Royalty6.17
Other Cost0.998245
Quality Deviance0
Grade Deviance0
Total Cost4703
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.28
Fe3.70
SiO215.12
Al2O34.88
P0.124
Size 0-10MM12.45
Size 10-20MM1.80
Size 20-100MM50.65
Size +100MM35.10
MOISTURE6.21