Supply Date12 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32
Freight22.0971
Loading Charges1
Offloading Charges0
Royalty8.21
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4361.83
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.22
Fe3.56
SiO211.74
Al2O35.01
P0.110
Size 0-10MM6.02
Size 10-20MM1.70
Size 20-100MM27.10
Size +100MM65.18
MOISTURE3.75