Supply Date12 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.54
Freight22.0971
Loading Charges1
Offloading Charges0
Royalty8.21
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4844.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.85
Fe3.71
SiO211.95
Al2O34.28
P0.109
Size 0-10MM5.78
Size 10-20MM1.45
Size 20-100MM33.67
Size +100MM59.10
MOISTURE4.02