Supply Date07 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.5
Freight22.0971
Loading Charges1
Offloading Charges-0.002028986
Royalty7.76
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4687
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.15
Fe3.84
SiO211.72
Al2O34.08
P0.122
Size 0-10MM5.12
Size 10-20MM3.12
Size 20-100MM48.90
Size +100MM42.86
MOISTURE2.12