Supply Date08 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.94
Freight25.42
Loading Charges1
Offloading Charges0.001431025
Royalty7.76
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4863
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.12
Fe3.38
SiO211.46
Al2O33.84
P0.112
Size 0-10MM4.70
Size 10-20MM2.45
Size 20-100MM33.15
Size +100MM59.70
MOISTURE1.45