Supply Date04 Dec 2021
Contract NumberSAFAL/P/IRON ORE/11.13/2021
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberACCELERATED GERMINATION CORPORATION
Deviance0
Inward Quantity34.04
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost583.44
Conversion Rate (Please insert 1 if no conversion is required)17.503
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe65.84
Mn0.12
SiO25.98
Al2O33.55
P0.124
Size 0-10MM10-150mm