Supply Date06 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.96
Freight11.074
Loading Charges1
Offloading Charges0
Royalty7.76
Other Cost11.02761
Quality Deviance0
Grade Deviance0
Total Cost4478
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.12
Fe3.90
SiO211.12
Al2O34.55
P0.126
Size 0-10MM4.05
Size 10-20MM1.52
Size 20-100MM37.21
Size +100MM57.22
MOISTURE3.28