Supply Date06 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.34
Freight25.4268
Loading Charges1
Offloading Charges-0.001375894
Royalty7.76
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5058
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.95
Fe3.84
SiO213.05
Al2O33.92
P0.124
Size 0-10MM5.88
Size 10-20MM1.45
Size 20-100MM46.97
Size +100MM45.70
MOISTURE5.19