Supply Date06 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity31.58
Freight24.8214
Loading Charges1
Offloading Charges0
Royalty7.4
Other Cost1.8587
Quality Deviance0
Grade Deviance0
Total Cost4423.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.84
Fe4.02
SiO213.28
Al2O34.05
P0.122
Size 0-10MM6.95
Size 10-20MM2.06
Size 20-100MM20.79
Size +100MM70.20
MOISTURE5.02