Supply Date05 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity39.56
Freight21.7944
Loading Charges1
Offloading Charges-0.001769464
Royalty7.9
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5368
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.38
Fe3.42
SiO210.96
Al2O34.02
P0.121
Size 0-10MM5.22
Size 10-20MM2.08
Size 20-100MM37.50
Size +100MM55.20
MOISTURE5.02