Supply Date04 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.74
Freight22.097
Loading Charges1
Offloading Charges0
Royalty8.74
Other Cost2.15305
Quality Deviance0
Grade Deviance0
Total Cost4967.5
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.68
Fe3.70
SiO210.80
Al2O34.78
P0.105
Size 0-10MM2.05
Size 10-20MM1.52
Size 20-100MM40.88
Size +100MM55.55
MOISTURE0.92