Supply Date04 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.88
Freight25.4268
Loading Charges1
Offloading Charges0
Royalty8.47
Other Cost2.223244147
Quality Deviance0
Grade Deviance0
Total Cost5099.27
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.10
Fe3.52
SiO210.95
Al2O34.26
P0.112
Size 0-10MM1.64
Size 10-20MM2.04
Size 20-100MM30.50
Size +100MM65.82
MOISTURE0.87