Supply Date03 Jan 2022
Contract NumberSAFAL/P/MN ORE/12.4/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity45.3
Freight21.7944
Loading Charges1
Offloading Charges0
Royalty8.74
Other Cost2.21567
Quality Deviance0
Grade Deviance0
Total Cost6285.38
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.88
Fe3.23
SiO28.97
Al2O34.22
P0.108
Size 0-10MM1.28
Size 10-20MM1.57
Size 20-100MM43.07
Size +100MM54.08
MOISTURE0.67